SHINKENCHIKU-SHA AOYAMA HOUSE
OFFICE OF KUMIKO INUI
- Outline
- This project is a renovation of the first floor of a three-story imported house built in the late 1990s. The interior consists of three spaces: a lecture room, a meeting room, and a workroom. The three spaces, a lecture room, a meeting room, and a workroom, are gently separated by the overlap of existing reinforced concrete walls.
- Location
- Journal
- 084P
- Related Link
- Read monthly critiqueShopYouTube-01
This Datasheet is translated via Deepl.com
- Location
- 2-19-14 minami-aoyama, minato-ku, tokyo
- Builder
- yoshioka bunko scholarship society
- Design
- Construction
- Architecture kumiko inui architects
- Attn: inui kumiko, aizawa kazutaka, daito naoo
- Structure
- tectonica contact: yoshinori suzuki
- Structural cooperation mitsuhiro kaneda laboratory, tokyo university of the arts
- Attn: kaneda mitsuhiro
- Equipment
- eosplus contact: kazuhiro endo, daisuke natori (former firm member)
- Supervision
- kumiko inui architects
- Attn: inui kumiko, aizawa kazutaka
- Construction
- Construction
- kitano construction contact: mitsuyuki nakamura
- Hvac/hygiene tsunetsuka kogyo attn: hirotaka kishimoto
- Electricity
- ken sugawara, touhou electric
- Scale
- Site area
- 151.28m2
- Building area
- 80.69m2
- Total floor space
- Total floor area 232.54m2
- 1st floor 80.69m2 / 2nd floor 73.81m2
- 3rd floor 78.04 m2
- Building-to-land ratio
- 53.30% (allowable: 60%)
- Floor area ratio
- Floor-area ratio: 153.70% (allowable: 300%)
- Number of stairs or stories (storeys)
- Number of floors 3 floors above ground
- Dimensions
- Maximum height
- 9,990mm
- Height above the ground
- Eave height 8,318mm
- Floor height
- 1st floor: 3,088mm
- Ceiling height lecture room: 2,337mm
- Entrance and meeting room: 2,668mm
- Office: 2,647mm
- Site conditions
- Local district
- Regional district type 2 exclusive district for medium and high-rise residential buildings quasi-fire prevention district
- Road width
- 4m west, 4m north
- Structure
- Main structure
- wooden, partially reinforced concrete
- Pile and foundation cloth foundation
- Air conditioning
- Air conditioning system
- air-cooled heat pump system
- Heat source
- ehp
- Sanitary facilities
- Water supply
- direct water supply system
- Hot-water supply
- Hot water supply gas water heater system
- Drainage
- combined sewage and miscellaneous drainage system
- Electrical equipment
- Power receiving method
- low-voltage overhead drawing method
- Contracted power
- Contracted electric power lamp: main switchgear contract 20kva
- Power: load equipment contract 3kw
- Manufacturing process
- Design period
- february-november 2015
- Construction period
- december 2015 - february 2016
- External finishes
- Roof
- national fullbest 20 5.0" sloped, liner roofing (mitsuboshi) (existing)
- Outer wall
- Exterior walls: dry brick tiling
- Aperture
- Openings wooden pair glass airtight sash pella proline (existing)
- Interior finishing
- Floor
- composition vinyl floor tile (tori: machico v)
- Mortar repair on walls and ceiling, ep-g coating