HOKKAIDO-CHOSHA SEISMIC RETROFITTING
bookmark_outline
TAKENAKA CORPORATION
Outline
The seismic isolation of the building was carried out using the "rolling construction plan," in which equipment was renewed sequentially while using the "seismic isolation device preloading method" to partially isolate the underground machine room floors. The equipment and machinery rooms were rearranged to create extra space, which was transformed into new living rooms.
Location
Japan | Hokkaido
Journal
Shinkenchiku March 2017 issue 160P