THE ROOF OF THE GROUND

Outline
This is a high school ground improvement project consisting of three buildings: a parking lot for large buses, a restroom building, and a corridor connecting to the school building. the roof of the parking lot is made of 50 x 50 mm square pipes stacked in a grid pattern to achieve a maximum span of 12 m. the restroom and corridor buildings are also constructed of 50 x 50 mm square pipes. the restroom and corridor buildings were also constructed with 50 x 50 mm square pipes.
Location
  • Fukuoka
Journal
Shinkenchiku September 2022 issue
Related Link
Shop

Additional subscription is required to browse more.

You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.

[Important | Notice of Terms of Use Revision] Effective Date of Revision: July 25, 2025 To enhance the security of our service, we will revise our Terms of Use and establish a new "Special Provisions Regarding Unauthorized Use." Note: "Unauthorized use" refers to multiple individuals using the service under a single Shinkenchiku.ID account.