NOUVELLE AKABANEDAI B1, B2 & C HOUSING BLOCK

Outline
The second phase of the Urban Renaissance Agency's reconstruction of Akabanedai Danchi, completed in 1962, is designed by NASCA + Spatial Research Institute + Nitto Corporation (Buildings 3 and 4 [B1 block]), Ichiura + CAt Design (Building 5 [B2 block]), and Yamamoto Hori Architects + Minobe Sekkei (Buildings 6 and 7 [C block]). Construction is scheduled to be completed in July 2010.
Location
  • Tokyo
Journal
Shinkenchiku August 2009 issue
Related Link
Shop

Additional subscription is required to browse more.

You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.