Karuizawa Tunnel

Outline
The site is tangential on the north side and there is a building on the east side, so the plan was made on the condition that the building should be out of sight. The elevation of the building with its hipped roof is wide. A steel angle (hot-dip galvanized) is placed at the tip of the roof slab finished with a silver top coat to emphasize the edge.
Location
  • Nagano
Journal
Jutakutokushu 2017:09
Related Link
Shop

Additional subscription is required to browse more.

You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.

[Important | Notice of Terms of Use Revision] Effective Date of Revision: July 25, 2025 To enhance the security of our service, we will revise our Terms of Use and establish a new "Special Provisions Regarding Unauthorized Use." Note: "Unauthorized use" refers to multiple individuals using the service under a single Shinkenchiku.ID account.