HIKARI FIRST BUILDING

Outline
Renovation of a rental house with a reinforced concrete wall structure completed in 1974. Since there was no inspection certificate, we proved the existing unqualified by field survey. The existing tower building was demolished so as not to exceed the existing shading lines, and an elevator was added adjacent to the entrance hall.
Location
  • Fukuoka
Journal
Shinkenchiku August 2013 issue
Related Link
Read monthly critiqueShop