AIDU CHUO HOSPITAL

Outline
A new building with seismic isolation structure was added to the existing "New Building". "The new building is retrofitted with seismic retrofitting. The new building was updated by applying the overall plan certification system. In the interior, the existing traffic flow plan is improved by adding back lines. The structure and exterior walls are all made of PC and PCa to improve construction accuracy and shorten the construction period.
Location
  • Fukushima
Journal
Shinkenchiku June 2009 issue
Related Link
Shop