G-house

Outline
G-house / Location / Yokohama / Main use / Exclusive use house / Family structure / Couple + 2 children / Design / KICA / Seiji Kamaji Architect Office / Seiji Kamaji Haritani Masashi (in charge) / KICA / Kazusa Kidozaki Architect Office / Kazusa Kidozaki (in charge) / Structure Oak Structural Design / Masato Shintani Yukari Umezawa (in charge) / Facilities Environment Engineering / Wada Takafumi Suzuki, Yuko Suzuki, Makisyo Otaki, Otaki Facility Office, Makisyo Otaki, Matsumotoshi Corporation, Hiroyuki Iwata, Akifumi Kogyo, Makoto Ame, Nakata, Toshiaki Nakata, Fujisawa Electric, Kikuchi Construction, Tatsu Kikuchi, Kikuchi Construction, Kikuchi Steel, Keiji Niikura, Niikura Kogyo, Hayashi Sheet Metal, Yoshishige Hayashi, Muto Kogyo, Metal Fittings, Koichi Muto Susumu Miyamae in charge of Glass Token, Koichi Mikami in charge of interior lumber, Kotaro Nakamura and Kanako Nakamura in charge of furniture Platz, Kunio Kaji in charge of painting Yayoi Paint Kogyo, structure and construction method, main structure and construction method steel-frame construction, partly RC construction, solid RC foundation, scale, two floors above ground and one basement floor, eaves height 6,100mm, maximum height 9,215mm, site area 309.57m2 | Building area 68.10m2 (Building-to-land ratio 21.99%, 40% by corner lot relaxation) | Total floor area 65.26m2 (Floor-area ratio 59.55%, 60% allowed) | Ground floor 50.70m2 1st floor 65.99m2 | 2nd floor 65.88m2 | Process | Design period September 2005 to September 2006 | Construction period October 2006 to June 2007 Site conditions: Class 1 exclusive area for low-rise dwellings; Road width: 5.0m east, 4.5m south, 6.5m north; Parking space: 4 cars; Exterior finishes: Roof and exterior walls: Galvalume steel sheet t=0.4mm, vertical hazel roofing; Openings: Aluminum sash; Exterior: White crushed stone mixed with grass; Interior finishes: Kitchen, dining room, bedroom 1 | Floor: Pine wood flooring t=15mm | Walls: Concrete faced with water repellent material | Ceiling: PBt=9.5mmEP | Bathroom: Mosaic tile flooring | Walls: Mosaic tile concrete faced with water repellent material | Ceiling: Silica board t=6mm+6mmOP | Living room: Mortar flooring | Floor: mortar, gold trowel and repellent coating | Walls: PBt=12.5mm+12.5mmEP | Ceiling: PBt=9.5mmOP | Bedroom 2, Bedroom 3, Bedroom 4: floor: lauan plywood t=5.5mmCL | Walls: PBt=12.5mmEP | Ceiling: PBt=9.5mmEP | Equipment system: air conditioning/heating system/room air conditioner | Hot water supply/water supply system Eco-Cute / Water supply and drainage system / Water main direct connection / Drainage system / Public sewer discharge / Main equipment used / Sanitary equipment / TOTOINAXT-form / Kitchen equipment / Matsushita Electric Works / Lighting / Yamagiwa Endo Lighting Maxray Matsushita Electric Works / Building hardware / Sugatsune Union Miwa Lock / Photography / Yasuhiro Nakayama, Photography Department of this magazine
Location
  • Kanagawa
Journal
Jutakutokushu November 2007 issue
Related Link
Shop