• Ja
  • En
Subscribe
arrow_left
BRILLIA TOWER NISHIJIN/PRALIVA
bookmark_outline
TAKENAKA CORPORATION
Outline
After the closure of a commercial facility that had been in operation since 1981, a residential and commercial area was planned while partially demolishing and reusing the building. by reusing the existing frame, the construction period was shortened by approximately 20 months, and the frame that should have been built was reduced by approximately 25%.
Location
Japan | Fukuoka
Journal
Shinkenchiku February 2022 issue 172P