- This project is a renovation of the first floor of a three-story imported house built in the late 1990s. The interior consists of three spaces: a lecture room, a meeting room, and a workroom. The three spaces, a lecture room, a meeting room, and a workroom, are gently separated by the overlap of existing reinforced concrete walls.
- Location
- Journal
- 084P
- Related Link
- Read monthly critiqueShopYouTube-01
This Datasheet is translated via Deepl.com
- Location
- 2-19-14 minami-aoyama, minato-ku, tokyo
- Owner
- Yoshioka Bunko Scholarship Society
- Design
- Architecture
- Kumiko Inui Architecture Design Office
- Attn: inui kumiko, aizawa kazutaka, daito naoo
- Structure
- tectonica contact: yoshinori suzuki
- Structural cooperation mitsuhiro kaneda laboratory, tokyo university of the arts
- Attn: kaneda mitsuhiro
- Equipment
- eosplus contact: kazuhiro endo, daisuke natori (former firm member)
- Supervision
- kumiko inui architects
- Attn: inui kumiko, aizawa kazutaka
- Construction
- Architecture
- Kitano Kensetsu Contact: Mitsuyuki Nakamura
- Air-conditioning / Sanitation
- , Tsunetuka Kogyo, Attn: KISHIMOTO, Hirotaka
- Electrical
- Ken Sugawara, Toyo Electrical
- Scale
- Site area
- 151.28m2
- Building area
- : 80.69m2
- Total floor area
- 232.54m2
- 1st floor 80.69m2 / 2nd floor 73.81m2
- 3rd floor 78.04 m2
- Building coverage ratio
- 53.30% (60% allowed)
- Floor area ratio
- Floor-area ratio: 153.70% (allowable: 300%)
- Dimensions
- Maximum height
- 9,990mm
- Eaves height
- 8,318mm
- Floor height
- 1st floor: 3,088mm
- Ceiling height
- Lecture room: 2,337mm
- Entrance and meeting room: 2,668mm
- Office: 2,647mm
- Site conditions
- Area, District
- Category 2 exclusive district for medium and high-rise residential buildings Quasi-fire prevention area
- Road width
- 4m west, 4m north
- Structure
- Main structure
- : wooden, partially reinforced concrete
- Pile / Foundation
- Cloth Foundation
- Air conditioning
- Air conditioning system
- air-cooled heat pump system
- Heat source
- ehp
- Sanitary facilities
- Water supply
- direct water supply system
- Hot water supply
- Gas hot water supply system
- Drainage
- : combined sewage and miscellaneous drainage system
- Electrical equipment
- Power receiving system
- Low-voltage overhead drawing system
- Contract demand
- Electric light: Main switchgear contract 20kVA
- Power: load equipment contract 3kw
- Manufacturing process
- Design period
- february-november 2015
- Construction period
- december 2015 - february 2016
- External finishes
- Roof
- national fullbest 20 5.0" sloped, liner roofing (mitsuboshi) (existing)
- Exterior wall
- dry brick tiling
- Opening
- Wooden pair glass airtight sash Pella Proline (existing)
- Interior finishing
- Floor
- composition vinyl floor tile (tori: machico v)
- Wall and ceiling
- mortar repair, EP-G coating