IZM – Illwerke Zentrum Montafon
HK Architekten, Hermann Kaufmann + Partners ZT
- Outline
- The headquarters of an electric power company built on the shore of a lake. The five-story building is a mixed structure with a reinforced concrete core and wooden columns and beams, using the same construction method as Life Cycle Tower ONE (2012), the first eight-story wooden building in Austria. The multi-story structure is realized with floor slabs made of a combination of laminated wood and concrete. Local timber was used for the structure and interior, and the wooden portion was assembled in approximately six weeks.
- Location
- Austria
- Journal
- Shinkenchiku 2025:09
- Related Link
- Shop
- Special Link
- Matrix of 100 Years of Architecture(The 100th Anniversary of Shinkenchiku)
- Previous Categories
- Neo-VernacularConstruction through Materials
- Category
- Timber’s Potential
- Next Categories
- Mass Timber Construction
- Decade
- 2010s
- Thema