MK10 MOBILITY

Outline
On the occasion of meiken kogyo's reconstruction of its head office and construction of a second clt factory, a relocatable rest area was planned to be used at both sites. four box-shaped clt units of 150 mm thick were transported by 10-ton trucks, dry-joined on site, assembled and disassembled at kyoto university's katsura campus, and then installed at meiken kogyo's second clt plant. the photo shows the temporary installation at kyoto university.
Location
  • Kyoto
Journal
Shinkenchiku October 2022 issue
Related Link
Shop