REIGAN CAFE
SUO
- Outline
- Renovation plan for a café and store on the south side of the yashima yashima interchange center. the first floor of the teahouse, which was built in the meiji period (1868-1912) and has been repeatedly renovated, was walled off to create a hill-like terrain that connects to the surrounding area, using excavated waste from the excavation of the yashima mountain communication center.
- Location
- Kagawa
- Journal
- Shinkenchiku September 2022 issue
- Related Link
- Read monthly critiqueShop
Additional subscription is required to browse more.
You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.