MISHIMATAISHA BUDEN

Outline
Renovation of mishima-taisha shrine mai-den. the existing main structure was not changed, but seismic reinforcement was carried out in areas that had little impact on the design, such as reinforcement of the long posts and foundation, replacement of the footing penetrations, and addition of flint beams. in consideration of its use for shinto rituals and dedication events, new fittings, kizahashi (staircases), lighting, etc. were installed.
Location
  • Shizuoka
Journal
Shinkenchiku May 2022 issue
Related Link
Read monthly critiqueShop