THE HOTEL SEIRYU KYOTO KIYOMIZU
TOKYU ARCHITECTS & ENGINEERS OBAYASHI CORPORATION A.N.D.
- Outline
- The existing school building (completed in 1933) was converted into a hotel while retaining its original features. In consideration of the existing school building, the U-shaped plan was retained and extended. The former schoolyard was converted to a lawn.
- Location
- Kyoto
- Journal
- Shinkenchiku September 2020 issue
- Related Link
- Shop
Additional subscription is required to browse more.
You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.