DIC BUILDING

Outline
Reconstruction of a 50-year-old office building. The office area was increased by changing the specific district, and the construction period was shortened by fully utilizing the existing underground structure. The round columns follow the position of the columns in the existing building.
Location
  • Tokyo
Journal
Shinkenchiku October 2015 issue
Related Link
Read monthly critiqueShop

Additional subscription is required to browse more.

You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.