HAMAMATSU SALA

Outline
Large-scale renovation of a 28-year-old commercial facility. An external steel frame is wrapped around the perimeter, and the entire frame is covered with glass to maintain durability. Construction is scheduled to be completed in 2010.
Location
  • Shizuoka
Journal
Shinkenchiku July 2010 issue
Related Link
Shop

Additional subscription is required to browse more.

You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.