HOUSE IN KAMIOSUGA

Outline
Renovation of the third floor of an existing reinforced concrete structure. The existing structure is regarded as the "site", and the LDK enclosed by a hanging wall is installed in it. This creates a semi-outdoor corridor space that serves as a buffer for the sound and thermal environment while gently dividing the entire space.
Location
  • Hiroshima
Journal
Shinkenchiku December 2009 issue
Related Link
Shop

Additional subscription is required to browse more.

You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.

[Important | Notice of Terms of Use Revision] Effective Date of Revision: July 25, 2025 To enhance the security of our service, we will revise our Terms of Use and establish a new "Special Provisions Regarding Unauthorized Use." Note: "Unauthorized use" refers to multiple individuals using the service under a single Shinkenchiku.ID account.