SHINKENCHIKU-SHA AOYAMA HOUSE

Outline
This project is a renovation of the first floor of a three-story imported house built in the late 1990s. The interior consists of three spaces: a lecture room, a meeting room, and a workroom. The three spaces, a lecture room, a meeting room, and a workroom, are gently separated by the overlap of existing reinforced concrete walls.
Location
Journal
084P
Related Link
Read monthly critiqueShopYouTube-01
This Datasheet is translated via Deepl.com
Location
2-19-14 minami-aoyama, minato-ku, tokyo
Owner
Yoshioka Bunko Scholarship Society
Design
Architecture
Kumiko Inui Architecture Design Office
Attn: inui kumiko, aizawa kazutaka, daito naoo
Structure
tectonica contact: yoshinori suzuki
Structural cooperation mitsuhiro kaneda laboratory, tokyo university of the arts
Attn: kaneda mitsuhiro
Equipment
eosplus contact: kazuhiro endo, daisuke natori (former firm member)
Supervision
kumiko inui architects
Attn: inui kumiko, aizawa kazutaka
Construction
Architecture
Kitano Kensetsu Contact: Mitsuyuki Nakamura
Air-conditioning / Sanitation
, Tsunetuka Kogyo, Attn: KISHIMOTO, Hirotaka
Electrical
Ken Sugawara, Toyo Electrical
Scale
Site area
151.28m2
Building area
: 80.69m2
Total floor area
232.54m2
1st floor 80.69m2 / 2nd floor 73.81m2
3rd floor 78.04 m2
Building coverage ratio
53.30% (60% allowed)
Floor area ratio
Floor-area ratio: 153.70% (allowable: 300%)
Dimensions
Maximum height
9,990mm
Eaves height
8,318mm
Floor height
1st floor: 3,088mm
Ceiling height
Lecture room: 2,337mm
Entrance and meeting room: 2,668mm
Office: 2,647mm
Site conditions
Area, District
Category 2 exclusive district for medium and high-rise residential buildings Quasi-fire prevention area
Road width
4m west, 4m north
Structure
Main structure
: wooden, partially reinforced concrete
Pile / Foundation
Cloth Foundation
Air conditioning
Air conditioning system
air-cooled heat pump system
Heat source
ehp
Sanitary facilities
Water supply
direct water supply system
Hot water supply
Gas hot water supply system
Drainage
: combined sewage and miscellaneous drainage system
Electrical equipment
Power receiving system
Low-voltage overhead drawing system
Contract demand
Electric light: Main switchgear contract 20kVA
Power: load equipment contract 3kw
Manufacturing process
Design period
february-november 2015
Construction period
december 2015 - february 2016
External finishes
Roof
national fullbest 20 5.0" sloped, liner roofing (mitsuboshi) (existing)
Exterior wall
dry brick tiling
Opening
Wooden pair glass airtight sash Pella Proline (existing)
Interior finishing
Floor
composition vinyl floor tile (tori: machico v)
Wall and ceiling
mortar repair, EP-G coating