JST TOKYO ENGINEERING CENTER

Outline
The first phase of the Tokyo Technical Center (right, this issue 0909) was completed on the north side of the site in 2009, and the space for the sales and quality assurance departments was added as a new building. The building is located on the northeast side of the site, so the volume of the building is shifted to the south side, and a part of the third floor is overhung, while the lower part is used as an entrance space. The exterior walls are composed of black aluminum spandrels and white ceramic tiles.
Location
  • Kanagawa
Journal
Shinkenchiku November 2018 issue
Related Link
Read monthly critiqueShop