MATSUO CONSTRUCTION SAGA HEADQUARTERS

Outline
Reconstruction of an office building along a main road near Saga Station. The six-story office building has a hybrid structure using steel columns and beams and CLT panels. The low-rise area in the foreground is the entrance hall. Windows are located on the ceiling and near the waist of each floor. The two-story conference room building is a pure wooden structure with fire-resistant exterior walls and slab-shaped Gerber bridge girders.
Location
  • Saga
Journal
Shinkenchiku October 2019 issue
Related Link
Shop

Additional subscription is required to browse more.

You are currently not subscribed to the magazines on this page (Shinkenchiku, Jutakutokushu, or a+u).
Please check your subscription plan and subscribe to additional magazines.

[Important | Notice of Terms of Use Revision] Effective Date of Revision: July 25, 2025 To enhance the security of our service, we will revise our Terms of Use and establish a new "Special Provisions Regarding Unauthorized Use." Note: "Unauthorized use" refers to multiple individuals using the service under a single Shinkenchiku.ID account.